Tuesday, June 1, 2010

Moving Along

I haven't posted in a few days because the kind of work that's been getting done isn't the kind that shows up in pictures very well.

We framed in the new wall between the master bedroom and bathroom -- you can see it in the right side of this picture below. Tanner and Ola showed up Sunday just in time to help frame in that wall and to demo the wall that used to have the door! Lucky them...

Tanner and Jesse work on removing the old wall.



Jesse rattled off numbers to me and I would run outside (in the dark) to cut the studs to length.



Jesse puts the top plate into place where the new header will go for the pocket door frame.



"Where did this come from, Jesse?"
"I don't know, I found it in the attic and I've been using it to push insulation around"
"Oh my! It's a _________!"
(Guess what it is in the comments and I'll post the answer on the next blog entry)



Jesse decided the ceiling in the bathroom had to go (more on that in one picture.) Luckily, Pat stopped by Monday to help while I was at work -- I don't know how Jesse would have gotten the new ceiling up, otherwise. (Pat received a nasty bump on the head for his troubles...thanks, Pat!)



Anybody see anything wrong with this toilet?
I was too upset to take a picture when it happened.
The bathroom ceiling did not want to come down without taking something else with it. So it broke the toilet tank.
We were going to re-use that toilet in a new location. Not anymore.
On the plus side, we got to order the fancy toilet that matches our tub and bathroom fixtures.
On the down side, it cost a lot AND it won't be here for two weeks.
What do we do until then, you might ask. Well, see that bucket next to the toilet? It gets filled up with water and when it's time to flush, we pour it on in. Oh yeah.



The bathroom as it is now. The mini-wall that will separate the tub enclosure from the toilet can be seen on the right. The giant header that Jesse managed to install on his own can be seen near the top. That old window should be gone in the next day or two.



Jesse will make a run to the Big Orange Box tomorrow to pick up some special order stuff that came in and return a bunch of stuff we don't need (lumber, the wrong size door, wrong size pocket door frame they gave us, etc.) After that he'll hopefully have time to re-frame and install the new window.

The next two weeks will be full of electrical and plumbing then after the inspection, we should be able to hook up our new toilet!

There's a bunch of other stuff on the horizon, but we'll take it in baby steps.

Oh -- and we just hung the drywall between the master bedroom closet and the living room! Time for bed.



EDIT: Jesse just received his grades for last semester. 4.0! He managed to help plan the wedding, take care of things around the house, take six classes (at THREE different schools) and still earn straight As. He's pretty great, that Jesse.

4 comments:

  1. It is a hook that you grab fish with.
    -Amy

    ReplyDelete
  2. If it's hollow, it's a church candlelighter and the snuffer part broke off.

    ReplyDelete
  3. I know I've said it before but you guys are so amazing! This is the most intense - live in - renovation I have EVER EVER seen.
    Impossible....but being done.
    Way to go and love to you both. Patty

    ReplyDelete